Friday, May 8, 2009

Kickoff!

Things were a lil messy at first with each doing something..


Time to improvise.. we had the manpower.. we had the tools..

A production line was rolled in..

Machinery for unpacking was unveiled..


Customized machine arm to preparing the masking tapes to the approximate length..


Robots were programmed to peel the ready masking tape and mask the mugs..


UAT'd production line in full swing.. Setup alpha(far right)..


Setup beta (far left) were having some difficulties, production levels were low!


Site supervisor noticed Setup beta's production level and gave some greasing..


The results of the production line setup? All packed and ready for shipment..


Just what was the fuss all about?

a BIG THANK YOU to the volunteers that succumbed to the torment!!!

1 comment:

  1. Thanks for the hardwork and effort! Without the support from the volunteers, we are going no way ;)

    ReplyDelete